Continental Focus, International Reach

Sarir Field Resumes Flows

Friday, February 27, 2015

NOC, Libya’s state-run oil and gas firm, reported that its subsidiary Arabian Gulf Oil Co. (AGOCO) has restarted production at the Sarir field. Sarir field was producing 185,000 bpd before the pipeline that links it to the Hariga export terminal was attacked.

It was also reported that cargos were being loaded at the Zueitina port for the first time in eight months.

 


« GO BACK