
Thursday, September 1, 2016
Sound Energy has reached the first casing point during the drilling of its second Tendrara well in Morocco, the TE-7. The first casing point is at a measured vertical depth of 462 meters.
The company has set the 13 3/8” casing and cemented in the Aalenian dolomite formation. It will now proceed to drill towards the second casing point of approximately 2,150 meters.